STS News

26
May 2026

Why Renewable Energy Procurement Risk Is Harder to Evaluate Than It Looks

Renewable energy procurement has changed significantly over the past several years.

Projects are moving faster. Supply chains are expanding globally. New manufacturers and technologies are entering the market constantly. Procurement teams are often expected to evaluate more suppliers in less time while still making decisions that will affect project performance for decades.

The problem is that many risks are not obvious during procurement.

A supplier may appear strong commercially while struggling with manufacturing consistency. A product may meet certification requirements yet still develop reliability problems in the field. A technology may offer efficiency improvements while still lacking long-term performance history.

In many cases, these issues are discovered only after products are already delivered, installed, or operating. By that stage, mitigation becomes significantly more disruptive and expensive.

This is one of the reasons due diligence is becoming increasingly important across renewable energy procurement.

 

Certifications and Datasheets Only Tell Part of the Story

Certifications, factory audits, and datasheets remain important procurement tools. However, they do not always provide a complete understanding of long-term execution and reliability risk.

Some products meet technical specifications while still containing design or manufacturing decisions that later create problems in the field.

For example, manufacturers may reduce material thickness to lower weight or cost. While this may improve shipping efficiency or pricing, it can also increase susceptibility to breakage during transportation, installation, or long-term operation.

Other issues may come from manufacturing variability itself. A product may perform well during qualification testing, but become more difficult to manufacture consistently at commercial scale, particularly during periods of rapid factory expansion or supplier growth.

In some cases, process variability, material sourcing changes, or production-line inconsistencies may not become visible until systems are already operating in the field.

These are the kinds of risks that often do not appear clearly in a datasheet, certification report, or standard factory audit.

In practice, many long-term reliability concerns only become visible after products have already moved from controlled qualification environments into large-scale commercial deployment.

 

Technology Risk and Product Risk Are Different

One of the more overlooked challenges in renewable energy procurement is understanding the difference between technology risk and product risk.

Technologies are often developed independently and later adopted or adapted by multiple manufacturers. In solar, examples include technologies such as TOPCon, Heterojunction (HJT), and Back Contact.

Some technologies reach commercial deployment before their long-term reliability is fully understood. Buyers therefore need to evaluate not only whether a technology appears promising today, but also how it may behave throughout the full lifecycle of a project.

At the same time, manufacturers may implement the same technology differently depending on engineering choices, manufacturing processes, materials, and product architecture.

As a result, two products built on the same underlying technology may still perform very differently over time.

For procurement teams, this creates an important distinction. Evaluating a technology alone does not necessarily provide a complete understanding of how a final product will perform in real-world operating conditions.

Understanding both technology-level risk and product-level risk is becoming increasingly important as organizations evaluate newer technologies and a growing number of global suppliers.

 

Procurement Risks Are Often Evaluated in Silos

Another challenge is that supplier, manufacturing, product, and technology risks are often evaluated separately even though they directly influence one another.

One assessment may focus on supplier financials and organizational capability. Another may evaluate manufacturing operations. Another may review product specifications or technology performance.

Individually, these assessments may provide useful information. However, they do not always create a complete understanding of how risks interact across the procurement lifecycle.

For example, a strong product design may still encounter problems if manufacturing consistency is weak. A mature technology may still perform poorly if implementation quality varies significantly between manufacturers. A supplier with strong commercial positioning may still struggle to scale production reliably under aggressive delivery timelines.

This fragmentation can make supplier comparison more difficult, particularly when procurement teams are evaluating multiple suppliers across different regions, technologies, and manufacturing environments.

 

Traditional Due Diligence Models Are Under Pressure

Historically, due diligence has often been treated as a one-time process performed relatively late in procurement.

Different assessments may be handled by different groups using different methodologies, timelines, and reporting structures. One review may focus on the supplier, another on the manufacturing site, another on the product itself.

The result is often fragmented information that can be difficult to compare or connect together.

At the same time, procurement timelines continue to compress. Teams are expected to evaluate suppliers more quickly while managing increasing technical and supply chain complexity.

This creates situations where important procurement decisions are sometimes made before complete visibility is available.

As renewable energy supply chains continue evolving, many organizations are recognizing that isolated or project-specific assessments are becoming more difficult to manage on their own.

 

Due Diligence Is Becoming Part of Procurement Strategy

Because of this, many organizations are starting to use due diligence earlier in procurement rather than treating it only as a final verification step.

The goal is not simply to generate reports. It is to better understand potential risks before contracts are finalized, production begins, or products arrive onsite.

That may include:

  • Comparing suppliers more consistently
  • Evaluating newer technologies more carefully
  • Identifying manufacturing concerns earlier
  • Understanding how product design decisions may affect long-term reliability
  • Reviewing whether suppliers can scale production consistently over time

Increasingly, procurement teams are trying to identify execution risks before they become schedule problems, warranty disputes, or operational issues later in the project lifecycle.

 

The Problem With Discovering Risk Too Late

Many procurement issues are not discovered during supplier selection. They appear later when production starts, when products arrive onsite, during installation, or after systems are already operating in the field.

At that point, the conversation changes completely. What could have been a procurement discussion becomes a schedule problem, a warranty problem, or an operational problem.

The challenge today is not simply determining whether a supplier or product meets minimum requirements. It is understanding how technology maturity, manufacturing execution, product design, and supplier capability may affect projects over the long term.

The earlier those risks are understood, the easier and less expensive they are to manage.


Learn more about Due Diligence

Beyond Forecasts: STS Launches Execution-Focused Market Intelligence for PV and BESS BuyersClick to learn more
+